Water Billing System

Language
Water Billing System was aimed to solve problem of water Bill calculations for Maseru and Mafeteng Clients. The reports are produced in the form of written file. Its just a simulation but it works correctly. This programme gives output as 4 files of which 2 files are txt files (Bills and default), and 2 are doc files (Maseru and Mafeteng). Bills file contains information for all clients who register in both Mafeteng and Maseru. Default file Contains information for all clients whom their outstanding balance is greater than 150.00. Maseru File contain information for all client who are located at Maseru and Mafeteng File also contains information for clients for Mafeteng. If a client's outstanding balance is greater than 150.00, there has to be a notification to that client that water will be disconnected after 30 days if no payment.

Note: Due to the size or complexity of this submission, the author has submitted it as a .zip file to shorten your download time. After downloading it, you will need a program like Winzip to decompress it.

Virus note: All files are scanned once-a-day by SourceCodester.com for viruses, but new viruses come out every day, so no prevention program can catch 100% of them.

FOR YOUR OWN SAFETY, PLEASE:

1. Re-scan downloaded files using your personal virus checker before using it.
2. NEVER, EVER run compiled files (.exe's, .ocx's, .dll's etc.)--only run source code.

Tags